The existing manufacturing building 1 of 3 buildings collapsed due to snow on March 24th of this year. This building is being demolished and replaced with a new $2 million Free Span Pre-Engineered Building that will replace the collapsed building.
The existing manufacturing building 1 of 3 buildings collapsed due to snow on March 24th of this year. This building is being demolished and replaced with a new $2 million Free Span Pre-Engineered Building that will replace the collapsed building.