This utility service center is constructing a new 112,000 square foot center along with a 9,000 square foot fleet garage. P.J. Hoerr is the subcontractor for the steel erection and the Pre-Engineered Metal Building (PEMB) erection. The structural steel portion is 46,000 square feet which includes an office and training area as well as meter storage. The PEMB is 66,000 square feet which includes storage and a welding shop.
Photos