Yinlun TDI Addition 2020 Morton, IL

April 1, 2021

Today found roof panel installation nearing completion. This project consists of a 54,000 sq. ft. addition to the existing facility that will serve as added warehouse/product assembly space for their existing manufacturing and distribution processes.  This is a pre-engineered metal building addition as manufactured by Butler Buildings being added onto an existing pre-engineered building P. J. Hoerr furnished and erected in 1997.

Photos