Washington CHSD #308

Washington, IL

Building Expansion for Washington CHSD in Washington IL

Project location: 115 Bondurant St, Washington, IL 61571

 

P.J. Hoerr constructed a 30,000 sf addition for Washington CHSD. The new space houses a multipurpose commons, kitchen and servery, administrative office suite, concession stand, main entry and connecting corridors housing various stair, elevator and ramp systems.  This addition included a forced air heating and cooling system, plumbing and electrical work at the addition and connecting existing buildings.  Renovation of classroom spaces to create nine expanded science labs, as well as various renovations in other portion of the building which included ceiling and floor work, wall finishes, installation of a platform lift and partition demolition/erection.  In addition to this work there were various mechanical, plumbing, power, lighting and data upgrades.  The project included related site work and a front drop off and parking area with concrete curbs, stairs and sidewalks, as well as storm sewer and detention basin work.